Below is the tasks completed throughout the work day: Make sure the git is ready for submission. (Completed 12:30 am) Update the config reference file. (Completed 1.45pm) Ensure all the documents are up to Qa standard. (Completed 4:14pm)
Author Archives: jal78aber
Integration Week Day 4 – 30/04/20
Worked all day. Below is the tasks throughout the day and their completion time: Finished updating the issues on GitLab (11:10 am). Made templates for the system tests and modular tests. (1:30pm) Ran all current JUnit tests. (2:30pm) Created a modular test doc for today 30/04/20. (4:03pm)
Integration Week Day 3 – 29/04/20
Worked all day. Below is the notes taken through out the day and the timestamps: Finished updating issues on Git – 10:26 am. Git Repository looks good. Added folders into dev that correspond with every day we had a meeting. This should have been updated throughout the project Added files into the weekly dev foldersContinue reading “Integration Week Day 3 – 29/04/20”
Integration Week – Day 2
Worked all day. Below is the notes taken throughout the day along with time stamps: Finished updating issues on the Gitlab 11am. Decomposition Description: Added cell classes, WordType and TestResults to the significant classes. Updated class mapping. (Finished 1:30 pm) Created a txt file to record software builds and tests failed. (Finished 2:20 pm) ReviewedContinue reading “Integration Week – Day 2”
Integration Week Day 1 – 27/4/20
Below is the notes taken through out the day along with time stamps when the tasks were completed. Finished adding to do list as issues on the git lab at 10:27am. When checking the code against the QA a few things I noticed: Packages must start with uk.ac.aber.cs221.group03. Each file should have a simple headerContinue reading “Integration Week Day 1 – 27/4/20”
Tenth Week 20th – 27th April
Prepping work for integration week. Going through java docs to see what needs changing. Had a meeting on the code and what will need changing next week. Looking at java docs -1 hour Going through QA. 10 to see the testing report requirements – 2 hours Meeting about the code – 1 hour
Ninth Week – 31/3/20
This week as there was very little work for the QA manager, I was assigned with helping the architecture team create java docs. Writing java doc comments and generating the java docs – 4 hours
Eighth Week – 24/03/20
With the UK in quarantine all meetings moved online. The formal review for the design document was done this week, as well as an informal meeting to show members not on the architecture team how the code functions. Formal review of design document – 2 hours Architecture meeting – 1 hour 30 mins Downloaded codeContinue reading “Eighth Week – 24/03/20”
Seventh Week – 17/3/20
This week I followed up on QA feedback from the test document review. I also created issues on the Gitlab according to the rest of Chris’ review. I went through the updates Merlin made to the UI use case document and PowerPoint. I again compared this to the feedback we got from our Project Manager.Continue reading “Seventh Week – 17/3/20”
Sixth Week – 9/3/20
This week was a slow week as no review of documents were needed. I followed up on the previous review of the testing document from Chris. I also prepared for the design document review for next week. Created a config reference document for the repository – 1 hour Prepared for the design document review –Continue reading “Sixth Week – 9/3/20”