Fifth Week – 02/03/20

This week was the group needed a full test document sheet ready to be forwarded to Chris, so we organised a formal testing document review. This was done on the 26/02/20. After the review took place, Halvor took charge in showing us how to use the Gitlab repository. I then focused on looking at the other SE.QA docs in preparation for the design document.

Formal testing document review – 2 hour

Gitlab repository session – 1 hour

Preparation for the design document review – 2 hour

Leave a comment

Design a site like this with WordPress.com
Get started